Click here to view 1132 Tech Support Depot search results.
Tech Support Depot articles are not displayed below.
206 S. MAIN ST
Enterprise, AL 36330 USA
Maintenance Update, Please read the R21 release notes.
http://www.digitrax.com/downloads/dt402-firmware/ (Video)c44_9 8 bit project by Digitrax Inc.
http://www.digitrax.com/sound-depot/c44-9-diesel-scheme/#sp_c44_9 (Sound Project)FairbanksMorse_OP 8 bit project by Digitrax Inc.
https://www.digitrax.com/sound-depot/fairbanks-morse-opposed-piston-switcher-1860-schem/#sp_fairbanksmorse_op (Sound Project)Digitrax is a full time professional company dedicated to bringing superior engineering, quality and affordability to model railroaders everywhere. The first time we ran a digital command control system we knew we couldn't live without one but, we couldn't afford it either. The Digitrax complete train control system is our answer for model railroaders who want to enjoy the excitement of the latest train control technology without taking out a second mortgage! The system is affordable and flexible.
https://www.digitrax.com/ (Page)j611 8 bit project by John McMasters
http://www.digitrax.com/sound-depot/norfolk-and-western-611/#sp_j611 (Sound Project)
332 Shirley Road
Shirley, Southampton SO15 3HJ United Kingdom
sw1c 8 bit project by Digitrax Inc.
http://www.digitrax.com/sound-depot/sw1-sw1c-4742-diesel-scheme/#sp_sw1c (Sound Project)UPChallenger_3985 8 bit project by Digitrax Inc.
http://www.digitrax.com/sound-depot/challenger-3985-sound-scheme/#sp_upchallenger_3985 (Sound Project)The Texas & Southwestern is a small N-Scale model railroad that features a Zephyr. The case study is broken down into several sections which detail the various facets of the construction and operation of this railroad.
http://www.digitrax.com/casestudies/texas-southwestern/ (Case Study)PUTRA (Projek Usahasama Transit Ringen Automatik), now called the Kelana Jaya Rail Line, is the third rapid transit line built in Kuala Lumpur, the capital of Malaysia. PUTRA decided to have a model built as a simulation of part of their system to: 1. simulate their operating practices 2. train their operators in the many aspects of manual operation 3. train their supervisors 4. simulate various emergency situations.The model was built in nine 78 inch by 36 inch sections. Construction and testing was done in the USA, then the model was crated and shipped to Kuala Lumpur.
http://www.digitrax.com/casestudies/putra-kelana-jaya-rail-line/ (Case Study)
3439 Decoursey Avenue
Covington, KY 41015 USA
The world is filled with places like Nemo Junction, a crossing between two railroads which is protected by a signal interlocking plant that also serves as an interchange point between these railroads.
http://www.digitrax.com/casestudies/nemo-junction/ (Case Study)evo_n2 8 bit project by Digitrax Inc.
http://www.digitrax.com/sound-depot/ge-evolution-series/#sp_evo_n2 (Sound Project)Easy to use tools to enhance your Digitrax experience on the iPhone/iPad!
https://www.digitrax.com/products/digitrax-tool-box-app/digitoolbox2/ (Product) https://www.digitrax.com/tsd/product/digitoolbox2/ (Product Support)Board replacement Decoder for Kato N Scale MP36PH Metra
http://www.digitrax.com/news/2011/12/01/dn163k4b-now-shipping/ (Article)The new UT6 Utility Throttle!
https://www.digitrax.com/news/2020/11/20/digitrax-proud-announce-ut6-family-throttles/ (Article)New accessories for the DS74 now shipping!
https://www.digitrax.com/news/2021/07/20/ds74-accessories-shipping-now/ (Article)Digitrax is now shipping the UP6Z LocoNet 6 Jack Universal Panel with Voltage Reduction for Z Scale Layouts.
http://www.digitrax.com/news/2012/08/21/new-z-scale-products-now-shipping/ (Article)Digitrax Complete Warranty Statement & Information, Digitrax gives a one year “No Worries" Warranty against manufacturing defects and accidental customer damage on all Digitrax products. Limitation of Warranty (The Legalese)
https://www.digitrax.com/support/returns/warranty/ (Page)