KB187 Case Study: PUTRA Computer Operation of the Kelana Jaya Rail Line Model (Part 5 of 5)

The Kelana Jaya Rail Line model layout uses WinLok 2.1 running on a PC under Windows 98 to operate the trains, turnouts, signals and to use the feedback from the block detectors for train control. This equipment was configured and programmed to PUTRA's specifications by Dr. Hans R. Tanner of DigiToys Systems. PUTRA specified the following capabilities for the control system used for the simulation: 1. Run eight trains at once in any combination of automated or manual control. 2. Define specific routings and be able to assign automatically or manually any route to any train at the time the ...

KB188 Case Study: PUTRA Operating the Kelana Jaya Rail Line (Part 4 of 5)

The layout uses twenty-eight turnouts on the mainline and an additional eleven turnouts in the yard. Each turnout is powered by a Tortoise slow motion turnout motor. Each of the twenty-eight mainline turnouts has three dwarf signals associated with it. The aspects of the signals are shown below. The indications of the signals are: Green = Proceed Yellow = Proceed with caution Red = Stop Each signal has one head with two LEDs. There are also thirty-eight mainline block signals (red/green) that are controlled by heavy duty single pole double throw relays. This makes a total of 122 signals. Since ...

KB189 Case Study: PUTRA Powering the Kelana Jaya Rail Line (Part 3 of 5)

The Kelana Jaya Rail Line model is a DCC intense layout, using many Digitrax command control components to achieve the goal of training operators of the actual rail line. The railroad was built in the 1990's and many of the Digitrax devices used for the Kelana Jaya Rail Line model have been superseded with improved units. Components used for the Kelana Jaya layout: 28 Mainline turnouts 11 Yard turnouts 39 Tortoise switch machines 84 Dwarf signals (yellow/green, red/green, red/yellow) 38 Mainline block signals 38 Heavy duty SPDT switch relays Digitrax Components Used for the Kelana Jaya layout: 1 DCS 100 ...

KB190 Case Study: PUTRA Kelana Jaya Rail Line - The Railroad (Part 2 of 5)

The track plan of the model Kelana Jaya Rail Line is shown below: Included in the model is the double track mainline with crossovers, two elevated stations with center platforms, one at-grade station with outside platforms and two underground stations, also with center platforms. The storage yard, maintenance yard and reversing loop at one end of the system and the four track stub terminal at the other end of the system are also modeled. The yard, station tracks, crossing loops and distances between stations are all scaled to hold trains no larger than three cars. The layout is designed to ...

KB191 Case Study: PUTRA Kelana Jaya Rail Line - Background (Part 1 of 5)

The prototype operation that gains the most from DCC is one of those least frequently modeled today: Rapid transit. Rapid transit consists of streetcars, interurban, subway, elevated or commuter rail track and equipment. The trains are usually very short and intervals between trains are relatively brief. Lots of trains run each hour and many trains are running at the same time. All of this operation is very much like a typical model railroad. Any photograph of a major downtown in the streetcar era will have from two to ten streetcars visible with some only feet apart. Simulating this type of ...